Introduction of Once-through Boiler and Fuel Switching to Tequila Plant

Representative Participant
Suntory Spirits Limited
Partner Participant: Tequila Sauza S. de R.L. de C.V.
Host Country
Mexico
Selected Year
2016
Type
JCM Model Project
Sector
Energy Efficiency
Not registered
Active

Outline of GHG Mitigation Activity

In this project, Once-through boilers will be installed instead of the existing flue boilers at Tequila Plant in Mexico. This project aims to improve boiler efficiency itself and to reduce the loss when the boilers startup and are low loading.

This project also aims to reduce about 30% CO2 emission by fuel switching from oil to natural gas.

Expected GHG Emission Reductions

3,435 tCO2-eq./year

CO2 Emission reductions

= Reference CO2 emissions (RE) – Project CO2 emissions (PE)

ØRE: 11,238 tCO2e/年

ØPE:   7,803 tCO2e/年

※Improvement of efficiency and fuel switching

CO2 emission coefficient(oil)  :2.8 ton-CO2/kL

CO2 emission coefficient(gas)  :2.2 ton-CO2/km3

Site of JCM Project

Related photos

  • Gallery

  • Gallery

  • Gallery

  • Gallery

  • Gallery

  • Gallery