28MW Binary Power Generation Project at Mahanagdong Geothermal Power Plant
- Representative Participant
- JGC Corporation
Outline of GHG Mitigation Activity
The project involves the introduction of a new 28 MW binary geothermal power plant to the existing 120 MW flash geothermal power plant owned and operated by the partner participant in the Mahanagdong district of Leyte Island. As a superior decarbonization technology, Organic Rankine Cycle technology is adopted to enable geothermal power generation at relatively low temperatures, resulting in clean and stable power generation.
This project contributes to the achievement of Philippines‘ policy for a renewable energy ratio target of 35% in 2030.
Expected GHG Emission Reductions
76,220 tCO2-eq./year
= (Reference CO₂ emissions)
– (Project CO₂ emissions)
・ Reference CO₂ emissions
= (Quantity of the electricity generated by the project) [MWh/year]
×Emission factor [tCO₂/MWh]
・ Project CO₂ emissions
= 0 [tCO₂/year])