Introduction of 0.9MW Solar Power System at International School

Representative Participant
Asian Gateway Corporation
Partner Participant: Canadian International School of Phnom Penh (CIS), Overseas Cambodian Investment Corporation (OCIC)



Host Country
Cambodia
Selected Year
2019
Type
JCM Model Project
Sector
Renewable Energy
Not registered
Active

Outline of GHG Mitigation Activity

0.9MW rooftop solar power system is installed in all school buildings at CIS in the Diamond Island City in the heart of Phnom Penh, and all net electricity generated is consumed off the grid to substitute grid electricity and reduce greenhouse gas (GHG) emissions.

Expected GHG Emission Reductions

462 tCO2-eq./year

= (Reference CO₂ emissions)
– (Project CO₂ emissions)

=〔(Quantity of the electricity generated by the project) [MWh/year] – 0 [MWh/year]〕
× Emission factor [tCO₂ /MWh]

Site of JCM Project

JCM Methodology

Methodology No. Title Methodology Proponent
KH_AM002 Ver1.0 Installation of Solar PV System Institute for Global Environmental Strategies