Introduction of Absorption Chiller to Chemical Factory

Representative Participant
Tokyo Century Corporation
Partner Participant: PT. Timuraya Tunggal
JCM Project Cycle:Not registered
Status:Installing

Outline of GHG Mitigation Activity

This project is to install an absorption chiller to the chemical factory of PT Timuraya Tunggal in Karawang, West Java Province.

The absorption chiller produces chilled water from wasted steam, and reduces the power consumption of electric chiller and GHG emission.

Expected GHG Emission Reductions

917 tCO2/year

= (Reference CO2 emissions) [tCO2/year]

       – (Project CO2 Emission) [tCO2/year]

= ((Reference Power Consumption) [MWh/year]

     – (Project Power Consumption) [MWh/year] )

     ×Emission Factor [tCO2/MWh]

Site of JCM Project

PT. Timuraya Tunggal (approx 70km from Central Jakarta)

Status

Related Documents

・Seminar on the JCM Implementation in Indonesia (2018)

 Introduction of Absorption Chiller to Chemical Factory – Mr. Takashi Aoki & Mr. Suguru Aoki, Tokyo Century Corporation