Waste Heat Recovery Power Generation at Cement Factory in Quang Ninh Province

Representative Participant
JFE Engineering Corporation
Host Country
Vietnam
Selected Year
2015
Sector
Energy Efficiency

Outline of GHG Mitigation Activity

By introducing Waste Heat Recovery Power Generation System to Thang Long Cement in Quang Ninh Province, the reduction of CO2 and power generation as a substitution of buying power generated by fossil fuel will be materialized.

Expected GHG Emission Reductions

29,415  t-CO2/year
Reference CO2 emissions: 29,415 t-CO2/year
0.5603 t-CO2/MWh* x 7MW x 7,500hrs.
= 29,415 t-CO2/year
Project CO2 emissions: 0 tCO2/year

Site of JCM Project

Thang Long Cement in Quang Ninh Province