Introduction of 5.8MW Rooftop Solar Power System to Fastener Factories

Representative Participant
Marubeni Corporation
Partner Participant: Marubeni Green Power Vietnam Company Limited
Host Country
Vietnam
Selected Year
2022
Type
JCM Model Project
Sector
Renewable Energy
Not registered
Installing

Outline of GHG Mitigation Activity

Total 5.7 MW solar power generation systems are installed on rooftops of a fastener factory and an aluminum factory. The participant of the host country is in charge of system installation, operation and maintenance of the systems, and supplies electricity to the factories.
This project reduces greenhouse gas (GHG) emissions by replacing part of the electricity from the fossil fuel-derived grid power with renewable energy.

Expected GHG Emission Reductions

1,434 tCO2-eq./year

= (Reference CO₂ emissions)
– (Project CO₂ emissions)

・ Reference CO₂ emissions
= (Quantity of the electricity generated by the project) [MWh/year]
×Emission factor [tCO₂/MWh]
・ Project CO₂ emissions
= 0 tCO₂/year

Site of JCM Project