Introduction of 3.1MW Rooftop Solar Power System to Fast-Moving Consumer Goods and Printing Factories in Java Island

Representative Participant
Alamport Inc.
Partner Participant: Shizen Energy Inc. PP, PT ATW Alam Hijau, PT Kao Indonesia, PT DNP Indonesia
Host Country
Indonesia
Selected Year
2022
Type
JCM Model Project
Sector
Renewable Energy
Not registered
Installing

Outline of GHG Mitigation Activity

Rooftop solar power systems (generating about 3.1 MW in total) are installed at one Consumer Goods factory and one printing factory to supply power to the factories to replace electricity purchased from the grid, thereby the project contributes to reduction in GHG emissions. The project participants install, manage, and maintain the systems.
This project contributes to the achievement of Indonesia’s policy for carbon neutrality by 2060.

Expected GHG Emission Reductions

2,658 tCO2-eq./year

= (Reference CO₂ emissions)
– (Project CO₂ emissions)
・ Reference CO₂ emissions
= (Quantity of the electricity generated by the project) [MWh/year]
×Emission factor [tCO₂/MWh]
・ Project CO₂ emissions
= 0 [tCO₂/year])

Site of JCM Project