Introduction of 2.1MW Solar Power System to Steel Wire Products and Aluminum Factories

Representative Participant
Tokyo Century Corporation
Partner Participant: PT.Sumiden Serasi Wire Products, PT.Daiki Aluminium Industry Indonesia
Host Country
Indonesia
Selected Year
2022
Type
JCM Model Project
Sector
Renewable Energy
Not registered
Installing

Outline of GHG Mitigation Activity

This project is to install Solar Power Systems to the Japanese Steel Wire Products and Aluminum Factories. Total capacity of 2.1MW Solar Power System will be installed on the rooftop of the factories.

All of the electricity generated by the solar system will be for self-consumption and replace grid electricity, and thus result in reducing greenhouse gas (GHG) emissions.

Expected GHG Emission Reductions

1,747 tCO2-eq./year

= (Reference CO2 emissions) [t CO2 /year]
   – (Project CO2 Emission) [t CO2 /year]

・ Reference CO₂ emissions
   = (Quantity of the electricity generated by the project) [MWh/year]
      ×Emission factor [tCO₂/MWh]

・ Project CO₂ emissions
   = 0 [tCO₂/year])

Site of JCM Project