9MW Solar Power Project in Teno, Maule Region
- Representative Participant
- Eurus Energy Holdings Corporation
Partner Participant: Eurus Energy Chile SpA, Venezia Solar SpA
Not registered
Installing
Outline of GHG Mitigation Activity
9 MW solar power system is installed in Teno, Maule Region. The generated electricity replaces a part of grid electricity with renewable energy and reduces greenhouse gas (GHG) emissions.
This project contributes to the achievement of Chile’s policy for a renewable energy ratio target of 70% in 2050.
Expected GHG Emission Reductions
8,239 tCO2-eq./year
= (Reference CO₂ emissions)
– (Project CO₂ emissions)
・ Reference CO₂ emissions
= (Quantity of the electricity generated by the project) [MWh/year]
×Emission factor [tCO₂/MWh]
・ Project CO₂ emissions
= 0 [tCO₂/year])