Introduction of 9.8 MW Rooftop Solar Power System in Industrial Park
- Representative Participant
- Osaka Gas Co., Ltd.
Partner Participant: SOL Energy Co., Ltd.
Not registered
Installing
Outline of GHG Mitigation Activity
9.8 MW solar power system is introduced on the rooftops of 8 tenants in Long Duc Industrial Park (LDIP) in Dong Nai province. The generated electricity is self-consumed by each tenant and surplus electricity is supplied to the LDIP management. The generated electricity is fully utilized, which reduces GHG emission.
This project contributes to the Power Development Plan 8 which plans to expand with spread of renewable energy in Vietnam.
Expected GHG Emission Reductions
4,312 tCO2-eq./year
= (Reference CO₂ emissions)
– (Project CO₂ emissions)
・ Reference CO₂ emissions
= (Quantity of the electricity generated by the project) [MWh/year]
×Emission factor [tCO₂/MWh]
・ Project CO₂ emissions
= 0 [tCO₂/year])