This project constructs 2 MW small hydro power plant in the Wae Lega river (basin area: 20 km2) of Flores island in East Nusa Tenggara Province. The electricity generated by the plant is supplied to PLN, resulting in greenhouse gas (GHG) emissions reductions by replacing grid electricity.
Electrification rate in East Nusa Tenggara is only 61.9%, which is the lowest in the country. Therefore, this project is expected to contribute to improving the electrification rate in the region.

Expected GHG Emission Reductions

9,335 tCO2-eq./year

Reference Emissions
= [Estimated annual energy generation] × [Emission factor of grid electricity]
= 9,335 tCO2/year

Project Emissions = 0