Introduction of 2.6MW Rooftop Solar Power System to Semiconductor Factory

Representative Participant
Kansai Electric Power Company, Incorporated
Partner Participant: Kansai Energy Solutions (Thailand) Co., Ltd.
Host Country
Thailand
Selected Year
2020
Type
JCM Model Project
Sector
Renewable Energy
Not registered
Active

Outline of GHG Mitigation Activity

2.6 MW solar power system is installed on the rooftops of a semiconductor factory, and all electricity generated from the project is consumed by the factory.
Greenhouse gas (GHG) emissions are reduced by replacing part of the grid electricity with renewable energy.
This project achieves energy saving and CO2 saving in Thailand and contributes to the energy saving policy of Thailand.

Expected GHG Emission Reductions

1,212 tCO2-eq./year

= reference CO2 emissions
 - project CO2 emissions

 ・Reference CO2 emissions
  = Quantity of the electricity generated by the project [MWh/year]
   x Emission factor [tCO2/MWh]

 ・Project CO2 emissions
  = 0 [tCO2/year]

Site of JCM Project