Outline of GHG Mitigation Activity
Rooftop solar power systems (total of about 4.2 MW) are installed at two pharmaceutical factories, nine vehicles dealer showrooms and two timber factories. The project participants are in charge of installation, management, and maintenance of the systems.
This project contributes to the achievement of Indonesia’s policy for a renewable energy ratio target of 23% in 2025.
Expected GHG Emission Reductions
3,785 tCO2-eq./year
= reference CO2 emissions
- project CO2 emissions
・Reference CO2 emissions
= Quantity of the electricity generated by the project [MWh/year]
x Emission factor [tCO2/MWh]
・Project CO2 emissions
= 0 [tCO2/year]