2MW Mini Hydro Power Plant Project in East Nusa Tenggara Province

Representative Participant
AURA-Green Energy Co., Ltd.
Partner Participant: PT. GISTEC PRIMA ENERGINDO, Tamagawa Holdings Co., Ltd.
Host Country
Indonesia
Selected Year
2019
Type
JCM Model Project
Sector
Renewable Energy
Not registered
Installing

Outline of GHG Mitigation Activity

This project constructs 2 MW small hydro power plant in the Wae Lega river (basin area: 20 km2) of Flores island in East Nusa Tenggara Province. The electricity generated by the plant is supplied to PLN, resulting in greenhouse gas (GHG) emissions reductions by replacing grid electricity.
Electrification rate in East Nusa Tenggara is only 61.9%, which is the lowest in the country. Therefore, this project is expected to contribute to improving the electrification rate in the region.

Expected GHG Emission Reductions

7,471 tCO2-eq./year

Reference Emissions
= [Estimated annual energy generation] × [Emission factor of grid electricity]
= 7,471 tCO2/year

Project Emissions = 0

Site of JCM Project