Introduction of 3.4MW Rooftop Solar Power System in Technical Center and Office Buildings

Representative Participant
Toyota Motor Corporation
Partner Participant: Toyota Daihatsu Engineering & Manufacturing Co., Ltd.
Host Country
Thailand
Selected Year
2018
Type
JCM Model Project
Sector
Renewable Energy
Not registered
Active

Outline of GHG Mitigation Activity

This project aims the reduction of CO2 emission by installing 3.4 MW solar power system on the rooftop of the technical center and office building of Toyota Daihatsu Engineering & Manufacturing Co., Ltd. located in Samutprakarn in eastern Bangkok.

Electricity generated by solar power system is consumed

in-house and replaces part of grid electricity consumption.

Expected GHG Emission Reductions

1,617 tCO2-eq./year

= (Reference CO2 emissions) [tCO2/year]

       – (Project CO2 Emission) [tCO2/year]

= ((Reference Power consumption) [MWh/year]

     – 0 [MWh/year]))×Emission Factor [tCO2/MWh]

Site of JCM Project

JCM Methodology

Methodology No. Title Methodology Proponent
TH_AM001 ver2.0 Installation of Solar PV System Institute for Global Environmental Strategies (IGES)