66.8MW Solar Power and 15MWh Storage Battery Project in Savannakhet Province
- Representative Participant
- Sharp Energy Solutions Corporation
Partner Participant: Green Energy Laos Development Co., Ltd., Khounxay Construction Development Group Sole Corporation
Not registered
Installing
Outline of GHG Mitigation Activity
This project introduces a 66.8MW ground-mounted solar power system with a 15MWh storage battery facility in Savannakhet Province.
Electricity generated by the solar system is sold to the state-owned power company (EDL). A part of electricity generated during daytime is stored in the battery and supplied to the grid during evening peak demand periods.
This project reduces greenhouse gas (GHG) emissions by replacing part of the electricity from the fossil fuel-derived grid power with renewable energy and contributes to stabilization of power supply in the country.
Expected GHG Emission Reductions
29,812 tCO2-eq./year
= Reference CO2 emissions [tCO2/year]
– Project CO2 emissions [tCO2/year]
・ Reference CO2 emissions [tCO2/year]
= (Quantity of the electricity generated by the project) [MWh/year] × Emission factor [tCO2/MWh]
・ Project CO2 emissions
= 0 [tCO2/year]