48MW Solar Power and 60MWh Storage Battery Project in Lopburi Province
- Representative Participant
- MinebeaMitsumi Inc.
Partner Participant: NMB-Minebea Thai Ltd., Minebea Super Solar Power Ltd.
Not registered
Installing
Outline of GHG Mitigation Activity
This project introduces a 48 MW ground mount solar power plant with 60 MWh storage battery in Lopburi Province. All the electricity generated by the independent solar plant is consumed by the Lopburi Plant of NMB-Minebea Thai.
This project reduces greenhouse gas (GHG) emissions by replacing part of the electricity from the fossil fuel-derived grid power with renewable energy .
Expected GHG Emission Reductions
21,545 tCO2-eq./year
= Reference CO2 emissions [tCO2/year]
– Project CO2 emissions [tCO2/year]
・ Reference CO2 emissions [tCO2/year]
= (Quantity of the electricity generated by the project) [MWh/year]
× Emission factor [tCO2/MWh]
・ Project CO2 emissions
= 0 [tCO2/year]
Site of JCM Project