Introduction of 0.8MW Rooftop Solar Power System to Automotive Parts Factory
- Representative Participant
- The Kansai Electric Power Company, Incorporated
Partner Participant: PT. Kansai Energy Solutions Indonesia
Not registered
Installing
Outline of GHG Mitigation Activity
This project introduces a solar power system (total : about 0.8MW) on the rooftops of an Automotive Parts Factory in the Karawang province. The generated electricity is consumed by the factory.
This project reduces greenhouse gas (GHG) emissions by replacing part of the electricity from the fossil fuel-derived grid power with renewable energy.
Expected GHG Emission Reductions
681 tCO2-eq./year
= Reference CO2 emissions [tCO2/year]
– Project CO2 emissions [tCO2/year]
・ Reference CO2 emissions [tCO2/year]
= (Quantity of the electricity generated by the project) [MWh/year]
× Emission factor [tCO2/MWh]
・ Project CO2 emissions [tCO2/year]
= 0 [tCO2/year]