50MW Solar Power Project in Sidi Bouzid Region

Representative Participant
Eurus Energy Holdings Corporation
Partner Participant: Scatec Sidi Bouzid Mezzouna PV Power
Host Country
Tunisia
Selected Year
2023
Type
JCM Model Project
Sector
Renewable Energy
Not registered
Installing

Outline of GHG Mitigation Activity

A 50 MW solar power system with single-axis trackers is installed in Sidi Bouzid Region, the central part of the country.
The generated electricity is sold to the Tunisian Company of Electricity and Gas (STEG) to replace a part of grid electricity with renewable energy and to reduce greenhouse gas (GHG) emissions.

Expected GHG Emission Reductions

47,101 tCO2-eq./year

= (Reference CO₂ emissions)
– (Project CO₂ emissions)

・Reference CO₂ emissions
= (Quantity of the electricity generated by the project)
[MWh/year] × Emission factor [tCO₂/MWh]

・Project CO₂ emissions
= 0 [tCO₂/year])