Introduction of 1.2MW Rooftop Solar Power System to Electronic Equipment Assembly Factory (JCM Eco Lease Scheme)

Representative Participant
Tokyo Century Corporation
Partner Participant: KATOLEC PHILIPPINES CORPORATION; BPI Tokyo Century Rental Corporation
Not registered
Active

Outline of GHG Mitigation Activity

This project reduces greenhouse gas (GHG) emissions by installing a 1.2 MW photovoltaic system on the roof of a Japanese manufacturing plant for self-consumption purpose.

The JCM Eco Lease scheme, which combines financing programme and leasing, reduces initial installation costs.

Expected GHG Emission Reductions

697 tCO2-eq./year

= (Reference CO₂ emissions) [t CO₂/year]
– (Project CO₂ Emission) [t CO₂/year]
・ Reference CO₂ emissions
= (Quantity of the electricity generated by the project) [MWh/year]
×Emission factor [t CO₂/MWh]
・ Project CO₂ emissions
=0 [t CO₂/year])

Site of JCM Project