Introduction of 0.5MW Rooftop Solar Power System to Automotive Parts Factory (JCM Eco Lease Scheme)
- Representative Participant
- BOT Lease Co., Ltd.
Partner Participant: KUROTA MEXICO, S.A. DE C.V. ; BOT FINANCE MEXICO, S.A. DE C.V., SOFOM, E.N.R.
Not registered
Active
Outline of GHG Mitigation Activity
This project is to install a solar power system to an automotive parts factory with the JCM Eco Lease Scheme.
Electricity generated by the solar system is used for their self-consumption and reduces greenhouse gas (GHG) emissions by replacing part of the grid electricity.
This is the first introduction of the JCM Eco Lease Scheme in Mexico.
Expected GHG Emission Reductions
392 tCO2-eq./year
= (Reference CO₂ emissions) [t CO₂/year]
– (Project CO₂ Emission) [t CO₂/year]
・ Reference CO₂ emissions
= (Quantity of the electricity generated by the project) [MWh/year]
×Emission factor [t CO₂/MWh]
・ Project CO₂ emissions
=0 [t CO₂/year])