Introduction of 3MW Rooftop Solar Power System to Paper Factory in Java Island
- Representative Participant
- Alamport Inc.
Partner Participant: Shizen Energy Inc.、PT ATW Alam Hijau、PT Eco Paper Indonesia
Not registered
Active
Outline of GHG Mitigation Activity
A rooftop solar power system (3 MW) is installed at a paper factory to supply power to the factory to replace electricity purchased from the grid, thereby the project contributes to reduction in greenhouse gas (GHG) emissions. The project participant installs, manages, and maintains the systems.
This project contributes to the achievement of Indonesia’s policy for carbon neutrality by 2060.
Expected GHG Emission Reductions
2,182 tCO2-eq./year
= (Reference CO₂ emissions)
- (Project CO₂ emissions)
・ Reference CO₂ emissions
= (Quantity of the electricity generated by the project) [MWh/year]
×Emission factor [tCO₂/MWh]
・ Project CO₂ emissions
= 0 [tCO₂/year])