Energy Supply Project by 2.9MW Rooftop Solar Power System to Metal Factories and Refrigerating Warehouse

Representative Participant
Osaka Gas Co., Ltd.
Partner Participant: OE Solar Co., Ltd.
Host Country
Thailand
Selected Year
2022
Type
JCM Model Project
Sector
Renewable Energy
Not registered
Active

Outline of GHG Mitigation Activity

2.9 MW Rooftop Solar Power Systems are installed on the rooftop of three factories.
The Project Participant is responsible for the installation, operation and maintenance of the Solar Power Systems and supplies electricity to the factories as the owner of the equipment.
The reduction of green house gas (GHG) emissions is made by replacing a portion of fossil-based fuel electricity with renewable energy.

Expected GHG Emission Reductions

1,150 tCO2-eq./year

= (Reference CO₂ emissions)[tCO₂/year] − (Project CO₂ emissions) [tCO₂/year] = ((Reference power consumption) [MWh/year] − 0 [MWh/year]) × Emission factor [tCO₂/MWh]

Site of JCM Project