Energy Supply Project by 4.0MW Rooftop Solar Power System to Parts and Tools Factories
- Representative Participant
- The Kansai Electric Power Company, Incorporated
Partner Participant: Kansai Energy Solutions (Thailand) Co., Ltd.
Not registered
Installing
Outline of GHG Mitigation Activity
Solar Power Systems (total : about 4.3 MW) are installed on the rooftops of Parts and Tools Factories, and all the generated power is consumed by each factory. By replacing a part of the grid electricity, the greenhouse gas (GHG) emissions are reduced.
This project also contributes to the policy to reduce GHG emissions in this country.
Expected GHG Emission Reductions
1,802 tCO2-eq./year
= (Reference CO2 emissions)
– (Project CO2 emissions)
・ Reference CO2 emissions
= (Quantity of the electricity generated by the project) [MWh/year]
×Emission factor [tCO2 /MWh]
・ Project CO2 emissions
= 0 [tCO2 /year])