Introduction of 0.8MW Solar Power System to Aluminum Products, Packaging Materials and Automotive Parts Factories (JCM Eco Lease Scheme)

Representative Participant
Tokyo Century Corporation
Partner Participant: DAIKI OM ALUMINIUM INDUSTRY (PHILIPPINES) ,INC. / FUJISASH PHILIPPINES,INC. / HKT PHILIPPINES, INC. / Kanepackage Philippines Inc. / BPI Century Tokyo Rental Corporation
Host Country
Philippines
Selected Year
2022
Type
JCM Model Project
Sector
Renewable Energy
Not registered
Active

Outline of GHG Mitigation Activity

This JCM Eco Lease Project introduces Solar Power Systems to the Japanese Factories with the JCM Eco Lease Scheme. Total capacity of 0.8MW Solar Power System is installed on the rooftops of the factories.

By combining financial supports and leasing, JCM Eco Lease Scheme contributes to GHG reduction.

Expected GHG Emission Reductions

544 tCO2-eq./year

= (Reference CO2 emissions) [t CO2 /year]
– (Project CO2 Emission) [t CO2 /year]

= ((Reference Power consumption) [MWh/year]
– 0 [MWh/year]))×Emission Factor [t CO2 /MWh]

Site of JCM Project