Energy Supply Project by 1.5MW Rooftop Solar Power System to Beverage Factory
- Representative Participant
- AAIC Japan Co., Ltd.
Partner Participant: OFGEN Limited
Not registered
Installing
Outline of GHG Mitigation Activity
1.5 MW solar power system is installed at a new beverage factory in Tatu City Industrial Park of Kiambu County to supply power to the factory and reduces greenhouse gas (GHG) emissions by replacing a part of the electricity consumption from the electricity grid.
This project contributes to the achievement of Kenya’s policy for transitioning to 100% clean energy by 2030.
Expected GHG Emission Reductions
924 tCO2-eq./year
= (Reference CO₂ emissions)
– (Project CO₂ emissions)
・ Reference CO₂ emissions
= (Quantity of the electricity generated by the project) [MWh/year]
×Emission factor [tCO₂/MWh]
・ Project CO₂ emissions
= 0 [tCO₂/year])
Site of JCM Project