Introduction of 5MW Solar Power System to Vehicle and Engine Plants

Representative Participant
Toyota Motor Corporation
Partner Participant: PT TOYOTA MOTOR MANUFACTURING INDONESIA
Host Country
Indonesia
Selected Year
2022
Type
JCM Model Project
Sector
Renewable Energy
Not registered
Installing

Outline of GHG Mitigation Activity

This project is to introduce a 5MW Solar Power system on the roofs of plants of PT TOYOTA MOTOR MANUFACTURING INDONESIA (TMMIN) which in Karawang.

This leads to reduction of grid electricity consumption by the plants, thereby to reduction of greenhouse gas (GHG) emissions.

Expected GHG Emission Reductions

3,808 tCO2-eq./year

=(Reference GHG emissions) [tCO2/year]
 - (Project GHG Emission) [tCO2/year]

・ Reference CO₂ emissions
 = (Quantity of the electricity generated by the project) [MWh/year]
   ×Emission factor [tCO₂/MWh]
・ Project CO₂ emissions
 = 0 [tCO₂/year])