Introduction of 3.3MW Rooftop Solar Power System in Woodworking Factories

Representative Participant
Sumitomo Forestry Co., Ltd.
Partner Participant: PT. AST INDONESIA
Host Country
Indonesia
Selected Year
2021
Type
JCM Model Project
Sector
Renewable Energy
Not registered
Installing

Outline of GHG Mitigation Activity

A total of 3.3MW of roof-mounted captive solar power generation system is installed at two woodworking factories located in an industrial park in the suburbs of Semarang city. The generated electricity replaces a portion of grid electricity to reduce greenhouse gas (GHG) emissions.
The project is being implemented as part of the Sumitomo Forestry Group’s efforts to reduce GHG emissions based on SBT (Science Based Targets) and to introduce renewable energy in line with the RE100 target. It also contributes to the achievement of country’s renewable energy introduction target of 23% by 2025.

Expected GHG Emission Reductions

2,396 tCO2-eq./year

= (Reference CO₂ emissions)
– (Project CO₂ emissions)

・ Reference CO₂ emissions
= (Quantity of the electricity generated by the project) [MWh/year]
×Emission factor [tCO₂/MWh]
・ Project CO₂ emissions
= 0 [tCO₂/year])