Energy Supply Project by 4.4MW Solar Power System to Ceramic Factory and Cement Plant
- Representative Participant
- Marubeni Corporation
Partner Participant: TeaM (Philippines) Energy Corporation
Not registered
Active
Outline of GHG Mitigation Activity
A 4.4MW solar power system is installed in a ceramic factory and a cement plant for self-consumption purposes. Partner Participant (PP) manages installation, operation and maintenance of the system, and the PP supplies the power to the offtakers.
The project reduces greenhouse gas (GHG) emissions by partially substituting the electricity from the grid with clean electricity from the solar systems.
Expected GHG Emission Reductions
2,776 tCO2-eq./year
= (Reference CO2 emissions)
– (Project CO2 emissions)
・ Reference CO2 emissions
= (Quantity of the electricity generated by the project) [MWh/year]
× Emission factor [tCO2/MWh]
・ Project CO2 emissions
= 0 [tCO2/year])
Site of JCM Project