Call for public inputs (Mongolia)
Call for public inputs on SDIP for a proposed JCM project “Installation of 5MW solar PV system and 3.6MWh battery energy storage system in Zavkhan Province” (15 Apr to 14 May 2026)
Call for public inputs on SDIP for a proposed JCM project “Installation of 5MW solar PV system and 3.6MWh battery energy storage system in Zavkhan Province” (15 Apr to 14 May 2026)