Upgrading and Installation of Centralized Control System of High-efficiency Heat Only Boiler (HOB)
- Representative Participant
- Suuri-Keikaku Co., Ltd.
Outline of GHG Mitigation Activity
This JCM model project consists of two model sites: Bornuur sum in a rural area and the 118th School in Ulaanbaatar City.
The Bornuur sum project includes the installation of heat only boilers (HOBs) as well as pipe laying work, electrical construction and boiler building construction. This project alters the current heat supply system in Bornuur sum of individual building-based heating, under which low efficiency HOBs and stoves are used. The centralized control system of high-efficiency HOBs is installed in this project. The improvement of boiler efficiency brings about a reduction of coal consumption to reduce CO2 emissions and other air pollutants.
The other project is the replacement of low-efficiency, old-type boilers with the latest high-efficiency model boilers at the 118th School in Ulaanbaatar City. This project also leads to the reduction of coal consumption to mitigate CO2 emissions as well as air pollutants.
Expected GHG Emission Reductions
298 tCO2-eq./year
in Bornuur sum
92 tCO2/year
in Ulaanbaatar City
Site of JCM Project
JCM Methodology
Methodology No. | Title | Methodology Proponent |
---|---|---|
MN_AM002 Ver1.0 | Replacement and Installation of High Efficiency Heat Only Boiler (HOB) for Hot Water Supply Systems | Suuri-Keikaku CO., LTD., Climate Experts LTD. |
Progress
JCM Project Registration
Reference No. | Project Title | Registration Date |
---|---|---|
MN001 | Installation of high-efficiency Heat Only Boilers in 118th School of Ulaanbaatar City Project | 30 Jun 2015 |
MN002 | Centralization of heat supply system by installation of high-efficiency Heat Only Boilers in Bornuur soum Project | 30 Jun 2015 |
Issuance of credits
Reference No. | Monitoring Period | Date of JC decision on notification | Amounts of Credits Issued | |
---|---|---|---|---|
Site 1 | MN001 | 20 Sep 2016 - 15 May 2018 | 06 Nov 2018 | 118 |
Site 1 | MN001 | 20 Sep 2015 - 15 May 2016 | 29 Sep 2016 | 50 |
Site 2 | MN002 | 19 Sep 16 - 15 May 18 | 06 Nov 18 | 208 |
Site 2 | MN002 | 15 Sep 15 - 02 May 16 | 29 Sep 2016 | 107 |