Title of Feasibility Study (FS) | Feasibility Study on Multiple CDM of the Solid Waste Intermediate Treatment Facility and Methane Gas Power Generation in Ipoh city, Malaysia |
FY | FY 2010 |
Main Implementing Entity | Yachiyo Engineering Co., Ltd. |
FS Partner(s) | Kajima Corporation, LTC Alam Bersih Sdn.Bhd. (LTC) |
Location of Project Activity | Malaysia (Ipoh City, State of Perak) |
Category of Project Activity | Waste Management |
Targeted GHG | CO2, CH4 |
CDM/JI | CDM |
Duration of Project Activity/ Crediting Period |
|
Summary of FS Report | Summary(PDF 137KB) |
Description of Project Activity | In the final landfill site in Ipoh city, the state of Perak, Malaysia, (1) an aerobic treatment (composting) of organic waste, (2) landfill gas (Landfill Gas: LFG) recovery and use, and (3) an improvement of water quality in the landfill site, are carried out and the stable treatment of solid waste is executed. The (1) and (2) activities are carried out complexly and it is the purpose for feasibility of cobenefit-type CDM called "the environmental improvement in circumference of a landfill site and the life extension of the landfill site by reducing the waste volume" and "the greenhouse gas reduction by CDM" used as the antipollution measures in host country. |
Methodology to be applied |
|
Baseline Scenario |
|
Demonstration of Additionality | There is no chance that a similar to this project will be carried out and since being registered as a CDM project is indispensable to implementation of this project, it can be judged that there is additionality in this project. |
Estimation of GHG Emission Reductions |
|
Monitoring Plan |
|
Environmental Impact Analysis | The environmental impact assessment (EIA) for this CDM project to construct facilities in the existing final landfill site is unnecessary and it is confirmed that it is satisfactory by presentation of the simple environmental report called Preliminary EIA. |
Project Feasibility | It can be said that the adjustment of the person concerned is still insufficient in order to realize the CDM projects. In addition to this situation, the plan of new landfill site has surfaced in Ipoh city and detailed contents have not been determined yet. Therefore, the great influence to the project implementation will be predicted from now on. Although there is a possibility of project implementation in a technical side and a funding side, it can be said that it is necessary to judge the final project implementation after confirming the social conditions or the intention of person concerned. |
"Co-benefits" (i.e. Improvement of Local Environmental Problems) |
|
Contribution to Sustainable Development in Host Country | - |