Electronic Decision by the JC (Mongolia)
The Joint Committee adopted the decision on the rules and guidelines documents and designation of TPEs by electronic means.
The Joint Committee adopted the decision on the rules and guidelines documents and designation of TPEs by electronic means.
Ministry of the Environment (MOE), Japan, announced a new project selected for Subsidy Programme for the JCM Facility Introduction for FY2025 to FY2027 (Seventh round).
Ministry of the Environment (MOE), Japan, announced a new project selected for Subsidy Programme for the JCM Facility Introduction for FY2025 to FY2027 (Sixth round).
Call for public inputs on proposed JCM projects CL006 “3MW Solar Power Project Utilizing Farmland in Maule Region”, CL007 “Energy Supply Project by 2.0MW Rooftop Solar Power System to Industrial Plastic Plant in Renca, Santiago Metropolitan Region” and CL008 “3.4MW Rice Husk Power Generation Project in Maule” (Chile) (7 February to 8 March 2026).
The Joint Committee adopted the decision on documents, no objection to the planned projects, and designation of TPEs by electronic means.