Energy Supply Project by 1.8MW Rooftop Solar Power System to Automotive Parts Factory and Construction Materials Factory

Representative Participant
The Kansai Electric Power Company, Incorporated
Partner Participant: Kansai Energy Solutions (Vietnam) Co., Ltd.
Host Country
Vietnam
Selected Year
2022
Type
JCM Model Project
Sector
Renewable Energy
Not registered
Installing

Outline of GHG Mitigation Activity

Solar Power Systems (total : about 1.8MW) are installed on the rooftops of Automotive Parts Factory and Construction Materials Factory. All the generated power is consumed by each factory. By replacing a part of the grid electricity, the greenhouse gas(GHG) emissions are reduced.
This project also contributes to the GHG emission reduction target, 27% reduction in 2030, based on Paris Agreement in this country.

Expected GHG Emission Reductions

815 tCO2-eq./year

= (Reference CO2 emissions)
– (Project CO2 emissions)

・ Reference CO2 emissions
= (Quantity of the electricity generated by the  project) [MWh/year]
×Emission factor [tCO2 /MWh]
・ Project CO2 emissions
= 0 [tCO2 /year])

Site of JCM Project