Energy Supply Project by 2.0MW Rooftop Solar Power System to Industrial Plastic Plant in Renca, Santiago Metropolitan Region

Representative Participant
Asian Gateway Corporation
Partner Participant: SOLARITY SPA
Host Country
Chile
Selected Year
2022
Type
JCM Model Project
Sector
Renewable Energy
Not registered
Installing

Outline of GHG Mitigation Activity

A 2.0 MW Rooftop Solar Power System is installed at a plastics factory owned by a major company located in Renca, Santiago Metropolitan Region, which has been implementing projects under City-to-City Collaboration with Toyama City since 2020. This project provides the factory with low-cost, clean energy from solar power generation and reduces greenhouse gas (GHG) emissions.
Furthermore, this project contributes to Renca’s commitment to Race-to-zero.

Expected GHG Emission Reductions

1,180 tCO2-eq./year

= (Reference CO₂ emissions)
– (Project CO₂ emissions)
・ Reference CO₂ emissions
= (Quantity of the electricity generated by the project) [MWh/year]
×Emission factor [tCO₂/MWh]
・ Project CO₂ emissions
= 0 [tCO₂/year])

Site of JCM Project