Introduction of 2.8MW Solar Power System in Healthcare and Food Factories

Representative Participant
Takasago Thermal Engineering Co., Ltd.
Partner Participant:PT. Engie Infrastructure Indonesia, PT. Indolakto, P&G Indonesia
Host Country
Indonesia
Year
2018
Type
JCM Model Project
Sector
Renewable Energy

Outline of GHG Mitigation Activity

This project will introduce 2.8MW Solar Power System in Healthcare and Food Factories near Jakarta. Electricity generated by Solar Power System replaces grid electricity to reduce GHG emission.

Site 1: PT. Indolakto
Electric-generating capacity : 0.8MW
Installation location :Roof top of the factory

Site 2: P&G Indonesia
Electric-generating capacity:2.0MW
Installation location :Idle land next to the factory

Expected GHG Emission Reductions

2,446tCO2/year

Site 1: PT. Indolakto      590tCO2/year

Site 2: P&G Indonesia  1,856tCO2/year

ER = RE - PE

ER: Emission reductions [tCO2/y]

RE: Reference emissions [tCO2/y]

The quantity of the electricity generated by PV system [MWh]×CO2 emission factor [tCO2/MWh]

PE: Project emissions   0[tCO2/y]

Site of JCM Project