Introduction of Gas Co-generation System and Absorption Chiller to Large Shopping Mall

Representative Participant
AEON MALL Co., Ltd.,
Partner Participant:PT. AMSL DELTA MAS

Outline of GHG Mitigation Activity

This project introduces Gas Co-generation system and high-efficient absorption type refrigerator to newly constructed large shopping mall.

Electricity generated by Co-generation system reduces consumption of grid power and Absorption type refrigerating system use the waste heat to generate cool water for air conditioning in the mall.

Expected GHG Emission Reductions

7,339 tCO2/year

= (Reference CO2 emissions) [tCO2/year]

       – (Project CO2 Emission) [tCO2/year]

=16,138 – 8,799

=7,339

Site of JCM Project