Host Country: VietnamJCM Feasibility Study (JCM FS)

Waste Heat Recovery Power Generation at Cement Factory in Quang Ninh Province

Implementing Entity: JFE Engineering Corporation

Outline of GHG Mitigation Activity

By introducing Waste Heat Recovery Power Generation System to Thang Long Cement in Quang Ninh Province, the reduction of CO2 and power generation as a substitution of buying power generated by fossil fuel will be materialized.

Expected GHG Reductions

29,415 t-CO2/year

  • Reference CO2 emissions: 29,415 t-CO2/year
    0.5603 t-CO2/MWh* x 7MW x 7,500hrs.
    = 29,415 t-CO2/year
  • Project CO2 emissions: 0 tCO2/year

Study Report

pagetop