Partner Country: IndonesiaJCM Model Project

Installation of Solar Power System and Storage Battery to Commercial Facility

Project Owner: (Japan) ITOCHU Corporation, (Indonesia) PT. Aeon Mall Indonesia

Outline of GHG Mitigation Activity

This project installs solar power system   and storage battery to commercial facility because Indonesia has a demand for the electricity with economic growth. The electricity from solar power system is supplied to lighting equipment. In a daytime, surplus power is charged to storage battery, and it is used during the night. The project achieves GHG mitigation by reducing  a purchase of the electricity from the electric company.

Expected GHG Emission Reductions

549 tCO2/year
((PV generation+(Storage Battery discharged energy- Storage Battery charged energy))× Emission Factor )

pagetop