Host Country: MongoliaJCM Model Project

Upgrading and Installation of Centralized Control System of High-efficiency Heat Only Boiler (HOB)

Project Owner: (Japan) Suuri-Keikaku, (Mongolia) Anu-Service

Outline of GHG Mitigation Activity

This JCM model project consists of two model sites: Bornuur sum in a rural area and the 118th School in Ulaanbaatar City.
The Bornuur sum project includes the installation of heat only boilers (HOBs) as well as pipe laying work, electrical construction and boiler building construction. This project alters the current heat supply system in Bornuur sum of individual building-based heating, under which low efficiency HOBs and stoves are used. The centralized control system of high-efficiency HOBs is installed in this project. The improvement of boiler efficiency brings about a reduction of coal consumption to reduce CO2 emissions and other air pollutants.
The other project is the replacement of low-efficiency, old-type boilers with the latest high-efficiency model boilers at the 118th School in Ulaanbaatar City. This project also leads to the reduction of coal consumption to mitigate CO2 emissions as well as air pollutants.

Expected GHG Emission Reductions

206 tCO2/year
in Bornuur sum

92 tCO2/year
in Ulaanbaatar City

JCM Project Register/Issuance of Credits

  • Methodology : Approved (Ref No. MN_AM002 Ver1.0)
  • Project Status: Registered (Ref No. MN001 and MN002
  • Issurance of Credits: None